Ford 99-03 7.3L Stage 2 LONG LEAD Injector Set 25 Percent Over Dynomite Diesel
Fuel Injector
DDP.AE-2
Pricing:
$3,616.33
Description
Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 2 injector set that's been fully balanced with 140cc injector bodies and 25 percent over nozzles. Comes with long lead injector for cylinder #8.
Approximately 75-100 RWHP gains over stock with proper supporting modifications. Great for a hot street truck with light duty towing. Turbo upgrade mandatory if towing frequently or heavy.
Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-2
Details:
- Liter: 7.3
- Engine: Powerstroke
- Years: 1999-2003
- Fuel Type: Diesel
- Condition: New
- Not For Sale In California
Details
- DDP.AE-2
- DDP.AE-2
- Dynomite Diesel
- New
Categories
Shipping Information
- Item Requires Shipping
- 27.0 lbs.
- W17.0000” x H9.0000” x L12.0000”
Customer Reviews
Total Reviews (0)
You must login to post a review.
Write the First Review!